We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Air conditioning outdoor unit.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Air conditioning outdoor unit - List of Manufacturers, Suppliers, Companies and Products

Air conditioning outdoor unit Product List

1~4 item / All 4 items

Displayed results

[Construction Effect Verification Case] Major Food Factory Air Conditioning Outdoor Unit

The payback period is 6.4 months, which is a short span for a typical investment recovery!

We would like to introduce a case study on the effectiveness of cleaning and heat-insulating coatings applied to the outdoor air conditioning units of a major food factory. The verification method involved receiving the electricity consumption and costs from the customer before and after the installation to assess the effectiveness. As a result of the installation, we successfully achieved a reduction of 14.8% (6.12 million yen). The payback period for the installation costs is 6.4 months, which is notably short for typical investment recovery. 【Case Overview】 ■ Verification Method - Received electricity consumption and costs from the customer before and after the installation to assess effectiveness. ■ Verification Results - Successfully achieved a reduction of 14.8% (6.12 million yen). - The payback period for the installation costs is 6.4 months, which is notably short for typical investment recovery. *For more details, please download the PDF or feel free to contact us.

  • Other Energy Saving

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Energy-saving case study of a food factory] Cleaning and heat-insulating coating of outdoor air conditioning units.

Achieved a 14.8% reduction in annual air conditioning costs through cleaning and heat-insulating coatings! *A collection of case studies from four industries is currently being offered.

In the materials available for download below, you can find case studies of construction verification results by industry. Among them, a notable case is the cleaning and heat-insulating painting performed on the outdoor air conditioning unit of a major food factory, where the construction cost was approximately 1.8 million yen, resulting in a payback period of 6.4 months, which is a relatively short span for typical investment recovery. 【Overview】 ■ Verification Method - We received the electricity consumption and costs before and after construction from the customer to verify the effects. ■ Verification Results - Successfully achieved a reduction of 14.8% (6.12 million yen). - The payback period for the construction costs was 6.4 months, which is a short span for typical investment recovery. *For other industry-specific construction verification case studies, please download the catalog or feel free to contact us.

  • Other Energy Saving

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Energy-saving case study of leisure facilities】Heat-resistant coating for outdoor air conditioning units

The average reduction rate of power consumption due to heat-insulating coating construction is approximately 27.8%! *A collection of case studies from four industries is currently being offered.

In the materials available for download below, you can find a collection of construction verification case studies categorized by industry. Among them, a notable case is the application of heat-reflective paint on the outdoor units of a major leisure facility, which achieved a maximum reduction rate in power consumption of approximately 25.7%. This demonstrates the significant energy-saving effects that can be obtained through the application of heat-reflective paint. 【Overview】 ■Verification Method - After construction, from 5 days to 2 weeks, cumulative meters were installed to measure the electricity consumption of the targeted outdoor units. ■Verification Results - The average reduction rate in power consumption was approximately 27.8%. - The maximum reduction rate in power consumption was approximately 25.7%. *For other industry-specific construction verification case studies, please download the catalog or feel free to contact us.

  • Other Energy Saving

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Energy-saving case study in nursing facilities] Chemical cleaning (partial) and heat-insulating coating for outdoor air conditioning units.

The reduction rate of electricity consumption is approximately 36% due to partial chemical cleaning and thermal insulation coating! *A collection of case studies from four industries is currently being offered.

In the materials available for download below, you can find a collection of construction verification case studies categorized by industry. Among them, in the case of a major elderly care facility where partial chemical cleaning and heat-reflective painting were performed on the outdoor air conditioning unit, the reduction rate of electricity consumption due to chemical cleaning alone was approximately 8.5%. While cleaning alone is already effective, the reduction rate increased to approximately 36.0% when combined with heat-reflective painting, confirming significant energy-saving effects by implementing both cleaning and heat-reflective painting. [Overview] ■ Verification Method - After construction, an accumulation meter was installed for 10 days to measure electricity consumption. - The extent of the difference in electricity consumption based on the implementation or non-implementation of each construction was verified. ■ Verification Results - The reduction rate of electricity consumption due to chemical cleaning alone was approximately 8.5%. - Additionally, the reduction rate increased to approximately 36.0% with the addition of heat-reflective painting. *For other industry-specific construction verification case studies, please download the catalog or feel free to contact us.

  • Other Energy Saving

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration